9D925
- Ponds & Magnox Vault ILW Scabblings
Concrete wastes from scabbling of fuel ponds and Magnox vault walls & floor. The waste stream includes both ponds, both Magnox Wet Vaults and both Splitter Vane Vaults. The scabbling technique removed both the surface coating (paint) and a thickness of underlying concrete. The wall thickness removed was ~5 mm.
Magnox Ltd | Hinkley Point A | ILW