Document library

You can use the filters to show only results that match your interests

Showing 36 documents

3L01 - Pond Water Ion Exchange Material
Spent ion exchange materials.

EDFE NGL | Heysham 1 | ILW


84 KB

255 KB

3L02 - Pond Water Filtration Sludge
Filtration of pond waters.

EDFE NGL | Heysham 1 | ILW


84 KB

254 KB

3L03 - Miscellaneous Contaminated Items
Redundant plant items and other materials contaminated beyond the limits for LLW.

EDFE NGL | Heysham 1 | ILW


84 KB

255 KB

3L04 - Desiccant
Exhausted desiccants that have been used for the drying of carbon dioxide reactor coolant.

EDFE NGL | Heysham 1 | ILW


86 KB

286 KB

3L09 - Miscellaneous Activated Components - Debris Vault 1
Irradiated reactor components (excluding principal fuel element stringer components and control rods).

EDFE NGL | Heysham 1 | ILW


85 KB

255 KB

3L11 - Dry Fuel Route LLW
General solid LLW arisings from the Heyham 1 Reactor Building dry fuel route processing areas. This area includes: Pile Cap, PUMF Cell and Workshop, Control Rod and Active Maintenance Facility, Nose Unit Maintenance Facility.

EDFE NGL | Heysham 1 | LLW


91 KB

287 KB

3L114 - Care & Maintenance: Miscellaneous Materials LLW
Miscellaneous LLW materials arising during C&M period.

EDFE NGL | Heysham 1 | LLW


87 KB

284 KB

3L115 - Care and Maintenance Preparations: Wet Fuel Route LLW
General solid decommissioning LLW arisings from the wet Fuel Route. Waste arising from plant dismantling and associated contamination control procedures.

EDFE NGL | Heysham 1 | LLW


88 KB

284 KB

3L116 - Care and Maintenance Preparations: Dry Fuel Route LLW
General solid decommissioning LLW arisings from the Dry Fuel Route. Waste arising from plant dismantling and associated contamination control procedures.

EDFE NGL | Heysham 1 | LLW


89 KB

285 KB

3L117 - Care and Maintenance Preparations: Gas Circulators LLW
General solid decommissioning LLW arisings from the gas circulator processing areas. Waste arising from plant dismantling and associated contamination control procedures.

EDFE NGL | Heysham 1 | LLW


88 KB

284 KB