Document library

You can use the filters to show only results that match your interests

Showing 1317 documents

4C317 - Decommissioning Stage 3: Graphite LLW
Reflector and shield graphite from reactor dismantling.

EDF Energy Nuclear Generation Ltd (EDFE NGL) | Torness | LLW

4C318 - Stage 3 decommissioning: Concrete (Reactor and Non-Reactor) LLW
Concrete wastes from dismantling of reactors and associated plant.

EDF Energy Nuclear Generation Ltd (EDFE NGL) | Torness | LLW

4C319 - Stage 3 Decommissioning: Miscellaneous Metals and Materials (Reactor and Non-Reactor) LLW
A variety of materials from plant dismantling.

EDF Energy Nuclear Generation Ltd (EDFE NGL) | Torness | LLW

4C320 - Stage 3 Decommissioning: Secondary Wastes LLW
Wastes arising from contamination control procedures during plant dismantling.

EDF Energy Nuclear Generation Ltd (EDFE NGL) | Torness | LLW

5B01 - PFR Raffinate
The source of this waste is from the reprocessing of Prototype Fast Reactor (PFR) fuel.

Nuclear Restoration Services Ltd (NRS) | Dounreay | ILW

5B01/C - Cemented PFR Raffinate
The source of this waste is from the reprocessing of Prototype Fast Reactor (PFR) fuel.

Nuclear Restoration Services Ltd (NRS) | Dounreay | ILW

5B02 - Low Alpha RHILW
Redundant and waste items from various cell operations including PIE, analytical, defuelling, POCO as well as routine operations.

Nuclear Restoration Services Ltd (NRS) | Dounreay | ILW

5B03 - Operational RHILW
The waste arises from PFR fuel cycle, including operations and support. It consists of both irradiated and contaminated items. The earliest waste has been in storage since 1980, the start of PFR fuel reprocessing.

Nuclear Restoration Services Ltd (NRS) | Dounreay | ILW